KNX
Light+Build: Day 1
Well technically it is day 2 as we arrived yesterday on the last day of set up (amazingly it has been nearly 2 weeks since the first stands were started) and it was like an untidy building site. Over night all the packing and rubbish was cleared and the flooring laid – what an amazing transition! Hall 8 has the majority of KNX manufacturers as well as KNX themselves.
Light and Build
It is coming up to that time when we all pack our bags and go to Frankfurt. Jung have been extremely supportive of us and we can be found on thier stand in Hall 8.0 with a live working system. Just ask for us on the stand while you admire what I think are the finest looking KNX switches in the world, the perfect compliment to our KNX Lighting Control Module
Wire In The Blood
I never cease to be surprised how diverse enquires can be. This week I had a call from the locations manager for the TV program ‘Wire in the Blood’ who had located a large empty office block fitted with KNX lighting controls, as a result, we will be controlling the lighting for a scene in an upcoming episode with KNX. How diverse can it get?
First Batch Out The Door
The festive break has seen some exciting activity with us. The first products went out the door for a small project in Hampshire consisting of our new DLC1000 Lighting Controller and Absence Detectors. As usual, the product always has to be shipped before the paperwork is complete but you can be assured the product information will be here very soon.
