The Tower Centre
Location:
- City:
- Ballymena ,
- Country:
- United Kingdom
Product(s) Used:
DLC100 Intelligent Marshalling Box with Daylight Harvesting The Tower centre is the main shopping centre in Ballymena and Durable Technologies products were selected for their price/performance.
The four main concourses have Electrak Busbar mounted at high level on both sides. The original lighting controls installed had become progressively unreliable over the years and needed replacing. A Jung FP701 KNX Colour Touch panel was installed in the control room providing both Timed Control and Manual Override. This panel was connected to five Jung 2304.16 Actuators, one in each concourse that in turn controlled a total of 105 DLC100 LCM’s. The Emergency Light Test function was also part of this installation